Komati River Bridge on Main Road 1 (MR1)
November 28, 2023
D39 Ntsantsama River Culvert
November 28, 2023The services provided include topographical survey, soil and borrow pit investigations, foundation investigations, preliminary and detailed design of Armco culvert and approach roads, contract documentation, contract administration and supervision.
| ASSIGNMENT NAME | COUNTRY | ||
| D93 Mlenzane River Culvert | Eswatini | ||
| LOCATION WITHIN COUNTRY | PROFESSIONAL STAFF PROVIDED BY THE FIRM | ||
| Makholweni in the Manzini Region | JG Metcalfe, NJ Mortimer, K Conradie, CG Layman | ||
| NAME OF CLIENT | № OF STAFF | ||
| Ministry of Works and Construction | 4 | ||
| ADDRESS | № OF STAFF-MONTHS | DURATION OF ASSIGNMENT | |
| P O Box 58, Mbabane, H100 | 5 | 12 | |
| START DATE | COMPLETION DATE | APPROX VALUE OF SERVICES | |
| May 1997 | June 1998 | Professional fees : US$ 5 300Construction costs : US$ 105 000 | |
| NAME OF ASSOCIATED CONSULTANTS | PROFESSIONAL STAFF-MONTHS OF ASSOCIATED CONSULTANTS | ||
| N/A | N/A | ||
| NAME OF SENIOR STAFF (PROJECT DIRECTOR / COORDINATOR, TEAM LEADER) INVOLVED AND FUNCTIONS PERFORMED | |||
| Project Engineer : JG Metcalfe – Client liaison, contract documentation and administration Structural Engineer : NJ Mortimer – Structural designRoads Engineer : CG Layman – Geometric design, drainage and pavement designResident Engineer : K Conradie – Project coordination, contract management, contract supervision and general issues | |||
| NARRATIVE DESCRIPTION OF PROJECT | |||
| Upgrading of existing low level crossing and approach roads. The upgrading consists of the construction of a 3,67 x 2,61m double-barrel Armco pipe arch culvert and the realignment of 300m of approach roads. The Armco culvert was protected with concrete ring beam, gabion baskets and mattresses on the inlet and outlets. The new 11m wide gravel approach roads with guardrails have been designed to improve the existing road geometry. | |||
| DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM | |||
| The services provided include topographical survey, soil and borrow pit investigations, foundation investigations, preliminary and detailed design of Armco culvert and approach roads, contract documentation, contract administration and supervision. | |||