Detailed Design of Bridge at Nkwene
June 10, 2025
Mbelebeleni Bridge
June 11, 2025Services included, soil and borrow pit investigations, preliminary and detailed design, contract documentation, tendering, adjudication, contract administration and management and supervision of construction.



| ASSIGNMENT NAME | COUNTRY | ||
| Construction of Zondwako–Mbangave Bridge Crossing over Usuthu River | Eswatini | ||
| LOCATION WITHIN COUNTRY | PROFESSIONAL STAFF PROVIDED BY THE FIRM | ||
| Zondwako, Manzini Region | S Makhubu, C Phiri, A. Vilakati, M Shabangu | ||
| NAME OF CLIENT | № OF STAFF | ||
| Microprojects Programme | 4 | ||
| ADDRESS | № OF STAFF-MONTHS | DURATION OF ASSIGNMENT | |
| P O Box , Mbabane, H100 | 10 | 12 | |
| START DATE | COMPLETION DATE | APPROX VALUE OF SERVICES | |
| November 2020 | December 2021 | Professional fees : US$ 60 000Construction costs : US$ 900 000 | |
| NAME OF ASSOCIATED CONSULTANTS | PROFESSIONAL STAFF-MONTHS OF ASSOCIATED CONSULTANTS | ||
| IC Development | 10 | ||
| NAME OF SENIOR STAFF (PROJECT DIRECTOR / COORDINATOR, TEAM LEADER) INVOLVED AND FUNCTIONS PERFORMED | |||
| Project Manager : S Makhubu – Contract management and professional responsibility Roads Technician : A Vilakati – Geometric design, pavement and drainage design of the approach roads Structures Engineer: C. Phiri – Bridge Structures Design Resident Engineer : M Shabangu – Client liaison, contract administration, construction supervision, and monthly payments | |||
| NARRATIVE DESCRIPTION OF PROJECT | |||
| The Scope of Work included the construction of an approximately 120m cast-in-situ concrete framed river crossing over the Usuthu River linking Zondwako with Mbangave. The Scope also included construction of concrete paved approach roads on either side of the crossing, construction of protection works, erection of guardrails, erection of road signs, road markings as well as landscaping and planting of plants. | |||
| DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM | |||
| Services included, soil and borrow pit investigations, preliminary and detailed design, contract documentation, tendering, adjudication, contract administration and management and supervision of construction. | |||