
Nhlangano Depot
February 28, 2024
Gwamile Road
March 13, 2024


| Project Name: Feasibility Study and Detailed Design and Construction Supervision of Agricultural Water Development Works at KaPhunga | Country: Eswatini | ||||||
| Project location within country: KaPhunga, Shiselweni Region | Professional staff provided by your company: S. MakhubuM. ShabanguB. Mhlongo | ||||||
| Name of client: Eswatini Agricultural Development Enterprise | No. of staff: 4 | ||||||
| Address: P.O Box 5836 Mbabane | No. of man-months: 6 | Duration of assignment (months): 6 | |||||
| Start date:(Month/Year): 17 January 2022 | Completion date(Month/Year): On-going | Approximate value of services: Professional fees: E 2 318 152.37Construction Fees: E32 877 870.10 | |||||
| Name of associated consultants, if any: ARQ, Geotech, Swazi Surveys, MTK | No. of man-months of professional staff provided by associated consultants: 9 | ||||||
| Name of senior staff involved, and functions performed: | |||||||
|
|||||||
Contract Information
|
|||||||
| Narrative description of project: Eswatini Agricultural Development Enterprise appointed ZMCK to carry out a Feasibility Study and Construction Supervision for the Construction of an Earth Dam and Irrigation infrastructure at KaPhunga. The site for the KaPhunga irrigation scheme is located approximately 9.0km due South East from Kholwane. The KaPhunga Dam is a 10m high earth embankment dam with a centrally located concrete buttress spillway. It includes a simple intake structure housing both the ecological flow and irrigation abstraction to be incorporated into the concrete spillway walls. The works includes the construction of a solar powered pumphouse and a holding dam. | |||||||
| Description of actual services provided by staff: ZMCK duties included preparation of a feasibility study and detailed design reports for the following aspects;
|
|||||||

