Bridge over the Komati River at Sihhoye
November 28, 2023
Nhlangano Depot
February 28, 2024Services included soil and material investigations, road and bridge design, contract documentation, tenders, adjudication, contract administration and supervision.
| ASSIGNMENT NAME | COUNTRY | ||
| Bridge over Phophonyane River on D11 | Eswatini | ||
| LOCATION WITHIN COUNTRY | PROFESSIONAL STAFF PROVIDED BY THE FIRM | ||
| North Western Region, North of Piggs Peak | CJ Rodda, E Borresen, CG Layman | ||
| NAME OF CLIENT | № OF STAFF | ||
| Ministry of Public Works and Transport | 5 | ||
| ADDRESS | № OF STAFF-MONTHS | DURATION OF ASSIGNMENT | |
| P O Box 58, Mbabane, H100 | 18 | 12 | |
| START DATE | COMPLETION DATE | APPROX VALUE OF SERVICES | |
| February 2000 | February 2001 | Professional fees : US$ 48 000Construction costs : US$ 300 751 | |
| NAME OF ASSOCIATED CONSULTANTS | PROFESSIONAL STAFF-MONTHS OF ASSOCIATED CONSULTANTS | ||
| Vela VKE Consulting Engineers(Pty) Ltd | 3 | ||
| NAME OF SENIOR STAFF (PROJECT DIRECTOR / COORDINATOR, TEAM LEADER) INVOLVED AND FUNCTIONS PERFORMED | |||
| Project Director : CJ Rodda – Contract administrationResident / Structural Engineer : E Borresen – Team leader, compiling progress reports, monthly certificates & chairing site meetingsRoads Engineer : CG Layman – Geometric design, drainage and pavement design | |||
| NARRATIVE DESCRIPTION OF PROJECT | |||
| New 2 x 15,5m span voided reinforced concrete bridge to replace an existing low level crossing of the river. 560m of gravel approach road to link to the existing gravel road on both sides. | |||
| DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM | |||
| Services included soil and material investigations, road and bridge design, contract documentation, tenders, adjudication, contract administration and supervision. | |||