
Royal Terminal at Sikhuphe International Airport
April 22, 2025
Musi Community Water Supply Scheme
May 19, 2025PROJECT NAME: Majotini Community Water Supply Scheme | COUNTRY: Swaziland | ||||||
| PROJECT LOCATION WITHIN COUNTRY: Majotini, Hhohho Region | PROFESSIONAL STAFF PROVIDED BY YOUR COMPANY: S. Makhubu G. Simpson | ||||||
| NAME OF CLIENT: Microprojects Programme | NO. OF STAFF: 3 | ||||||
| ADDRESS: P. O. Box 2122 MBABANE H100 | NO. OF MAN-MONTHS: 18 | DURATION OF ASSIGNMENT (MONTHS): 24 | |||||
| START DATE (Month/Year): 2004 | COMPLETION DATE (Month/Year): 2005 | APPROXIMATE VALUE OF SERVICES: Professional fees: E100 000.00 | |||||
| NAME OF ASSOCIATED CONSULTANTS, IF ANY: None | NO. OF MAN-MONTHS OF PROFESSIONAL STAFF PROVIDED BY ASSOCIATED CONSULTANTS: None | ||||||
| NAME OF SENIOR STAFF INVOLVED AND FUNCTIONS PERFORMED: | |||||||
| Project Manager/Resident Engineer Design Engineer | : : | C. Rodda/ S. Makhubu G. Simpson | – – | Client, developer and service authorities liaison, professional responsibility, quality control, contract management and administration, claims adjudication, charing site and liaison meetings. Design review, contract documentation and construction supervision | |||
| NARRATIVE DESCRIPTION OF PROJECT: The Majotini Community Water Supply Scheme is located in the Majotini/Lujingelo area of Nkaba. The scheme had been installed some years before, but due to the existing water source being insufficient the scheme had become obsolete. The project, therefore, involved the investigation of an alternative water source and a redesign, where necessary, of the existing system. | |||||||
| Description of actual services provided by staff: Services include the analysis of the existing system, locating the reservoir, geotechnical investigation of a borehole water source, contract documentation and supervision of construction. | |||||||


