October 14, 2024| ASSIGNMENT NAME: | COUNTRY | ||
| Swaziland Railways Rehabilitation | Eswatini | ||
| LOCATION WITHIN COUNTRY | PROFESSIONAL STAFF PROVIDED BY THE FIRM | ||
| Central Manzini and Lubombo Regions | C. J. Rodda, C. G. Layman | ||
| NAME OF CLIENT | № OF STAFF | ||
| CMC Railways Joint Venture | 3 | ||
| ADDRESS | № OF STAFF-MONTHS | DURATION OF ASSIGNMENT | |
| P O Box 666, Matsapha, M202 | 25 | 15 | |
| START DATE | COMPLETION DATE | APPROX VALUE OF SERVICES (Emalangeni) | |
| April 2002 | July 2003 | Professional fees : 28 000 Construction costs : 13.3 million | |
| NAME OF ASSOCIATED CONSULTANTS | PROFESSIONAL STAFF-MONTHS OF ASSOCIATED CONSULTANTS | ||
| MHP Geometrics (Surveyors) | |||
| NAME OF SENIOR STAFF (PROJECT DIRECTOR / COORDINATOR, TEAM LEADER) INVOLVED AND FUNCTIONS PERFORMED | |||
| Design Engineer: C. G. Layman – Horizontal and vertical alignment design, design co-ordination Design Engineer: C. J. Rodda – Design of erosion protection measures | |||
| NARRATIVE DESCRIPTION OF PROJECT | |||
| The rehabilitation of the 113kms east-west railway line including eight stations. The project was split into two sections being from Mpaka Station to Mocambique Border (50kms) and from Matsapha Station to Phuzumoya Station (63kms). Topographical survey of the existing rail line was compared to the original design of the horizontal and vertical alignments and adjustments were made for the new design cross-section to fit the existing platform shape with minimum improvements. The design of erosion protection measures was undertaken along the collapsed areas whenever necessary. | |||
| DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM Services included topographical survey, horizontal and vertical alignment design, design of erosion protection measures. | |||